Fenton Parkway Bridge Project

3 Documents in Project

Summary

SCH Number
2023050534
Lead Agency
California State University Board of Trustees
Document Title
Fenton Parkway Bridge Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2024
Document Description
San Diego State University is proposing to construct the Fenton Parkway Bridge Project to connect Fenton Parkway, which currently terminates north of the river channel, with Camino Del Rio North, south of the river channel. The bridge would provide a vehicular, bicycle and pedestrian crossing that spans the San Diego River in the Mission Valley community of the City of San Diego (City). The proposed bridge will be approximately 450 feet long and 58 feet wide, and have 2 through-traffic lanes, a center lane for southbound left-turn movements onto Camino Del Rio North, and separated bicycle and pedestrian paths on either side of the bridge. It will have up to 4 spans supported on concrete seat-type abutments in the river embankments at each end and two to three piers within the river channel. The proposed bridge will be constructed on real property owned by the City and upon completion of construction, the City will own, operate, and maintain the proposed bridge.

Contact Information

Name
Anne Collins-Doehne
Agency Name
California State University Office of the Chancellor
Job Title
Director of Land Use Planning and Environmental Review
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Southern California
Cross Streets
Fenton Parkway, Camino Del Rio N, Mission City Parkway
Zip
92108
Parcel #
433-250-1600; 433-250-0500
State Highways
1-15, 1-8, 1-805, SR 163
Railways
MTS Trolley
Airports
none within 2 miles
Schools
SDSU, Audeo Charter School
Waterways
San Diego River
Township
16S
Range
2W
Section
18

Notice of Determination

Approving Agency
The Board of Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print