Normandy Road Pedestrian Improvements Project

2 Documents in Project

Summary

SCH Number
2023050301
Lead Agency
City of Menifee
Document Title
Normandy Road Pedestrian Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2023
Document Description
The City of Menifee (City) proposes the Normandy Road Pedestrian Improvements Project (“Project”) which includes the construction of a pedestrian trail extending from existing sidewalks from the west and east along the north side of Normandy Road. The Project would include the demolition and grading of existing substrate, the construction of a pedestrian walkway, the installation of a pedestrian handrail and footing, site stabilization, striping of roadways, and final erosion mitigation. The pedestrian trail would be approximately 1,433 linear feet abutting the northern edge of pavement of Normandy Road and would be 10 feet wide. The Project would provide headwall improvements for the existing stormwater infrastructure that allows for drainage of an existing stormwater drainage channel. The trail would be constructed with asphalt concrete material and match grade with the existing Normandy Road.

Contact Information

Name
DIEGO GUILLEN
Agency Name
City of Menifee
Job Title
Associate Engineer
Contact Types
Lead/Public Agency

Location

Cities
Menifee
Counties
Riverside
Regions
Southern California
Cross Streets
. The major crossroads are Newport Road and Murphy Ranch Road

Notice of Determination

Approving Agency
City of Menifee
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
https://www.cityofmenifee.us/325/Environmental-Notices-Documents

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print