Palm Springs MDP Storm Drain Line 20, Stage 3

Summary

SCH Number
2023050103
Lead Agency
City of Palm Springs
Document Title
Palm Springs MDP Storm Drain Line 20, Stage 3
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2023
Document Description
Project will implement Stage 3 of Line 20 of the City of Palm Springs Master Drainage Plan, including installation of underground storm drains and ancillary structures within the public rights-of-way. New drains total 4,540± feet or 0.86 miles in length and include a 108-inch reinforced concrete pipe (RCP) to connect to Stage 2 in Ramon Road, a 10-foot wide by 7-foot high reinforced concrete box in Ramon Road, and 90-inch, 84-inch, and 78-inch RCPs in Farrell Drive. In addition, the Project will construct 42-inch and 54-inch laterals extending westward from Farrell Drive into Ramon Road and Baristo Road, respectively. These laterals total 987± feet or 0.19 miles in length.

Contact Information

Name
Edward Robertson
Agency Name
City of Palm Springs
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Palm Springs
Counties
Riverside
Regions
Southern California
Cross Streets
Ramon Road, Farrell Drive, central Palm Springs, Riverside County

Notice of Determination

Approving Agency
City of Palm Springs
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
Palm Springs City Hall, 3200 Tahquitz Canyon Way, Palm Springs, CA 92262

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print