Madera 99/233 Chowchilla Interchange Improvement Project

3 Documents in Project

Summary

SCH Number
2023040741
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
Madera 99/233 Chowchilla Interchange Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2023
Document Description
The California Department of Transportation (Caltrans) proposes to modify the existing State Route 99/State Route 233 interchange by constructing two roundabouts at the ramp intersections in the City of Chowchilla. Each roundabout will be constructed with two circulating lanes on the eastbound and westbound directions. The existing State Route 233 bridge over State Route 99 will remain in place to accommodate the eastbound traffic. A new separate concrete bridge will be constructed for westbound traffic. This new bridge will be constructed north of the existing structure and will have a 10-foot-wide sidewalk, 8-foot-wide outside shoulder, two 12-foot-wide lanes, and a 5-foot-wide inside shoulder.

Contact Information

Name
Javier Almaguer
Agency Name
Caltrans 6
Job Title
Senior Environmental Scientist Supervisor
Contact Types
Lead/Public Agency

Location

Cities
Chowchilla
Counties
Madera
Regions
Countywide
Cross Streets
State Route 233, Robertson Boulevard, State Route 99
Zip
93610
Total Acres
18.5
Parcel #
not applicable
State Highways
State Route 233, State Route 99
Railways
Union Pacific
Airports
Chowchilla Municipal
Schools
none
Waterways
Ash Slough
Township
9 S
Range
16 E
Section
29
Other Location Info
At the State Route 99/233 interchange from post miles 26.3 to 26.8 in the City of Chowchilla in Madera County

Notice of Determination

Approving Agency
Caltrans District 6
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print