Coastlands II Retaining Wall Project

3 Documents in Project

Summary

SCH Number
2023040738
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Coastlands II Retaining Wall Project
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2023
Document Description
The California Department of Transportation (Caltrans) will replace the failed Coastlands II Retaining Wall and add barrier systems for traveler safety on State Route 1. Other work will include the removal of the existing soil nail wall, reconstruction of the drainage inlet and culvert located near the southern terminus of the existing wall, restoration of the roadway, and removal of vegetation and trees within the area where the wall and rails will be constructed. Project activities will occur on State Route 1 at post mile 44.34 in Monterey County, roughly 1.1 miles south of Pfeiffer Canyon Bridge near Big Sur.

Contact Information

Name
Lara Bertaina
Agency Name
Caltrans District 5
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Near Big Sur, CA
Counties
Monterey
Regions
Countywide, Northern California
Cross Streets
Near Coastlands Road in Big Sur
Zip
93920
Total Acres
0.33
Parcel #
420-171-006
State Highways
1
Railways
none
Airports
none
Schools
none
Waterways
Pacific Ocean, Big Sur River, Mule Canyon Creek, Post Creek, Terrace Creek
Township
20S
Range
2E
Section
5
Base
Mt Diabl
Other Location Info
The project is located approximately 4 miles south of the town of Big Sur, and about 1.1 miles south of the Pfeiffer Canyon Bridge.

Notice of Determination

Approving Agency
Caltrans District 5
Approving Agency Role
Lead Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
District 5 Office, 50 Higuera Street, San Luis Obispo, CA 93041

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print