BBCCSD Cinderella and Pan Springs Pipeline Replacement Project

2 Documents in Project

Summary

SCH Number
2023040231
Lead Agency
Big Bear City Community Services District
Document Title
BBCCSD Cinderella and Pan Springs Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2023
Document Description
BBCCSD proposes to construct approximately 4,400 lineal feet (LF) of new pipelines within the Cinderella and Pan Springs areas of Big Bear City to replace pipelines that are no longer efficient or effective, due to age or because they are undersized, improving water quality and fire flow capabilities. The project includes replacement of existing water mains with new 8-inch piping on North Shore Drive, Mount Doble Drive, Gold Mountain Drive, Cinderella Drive, Pan Springs Lane, and Tiger Lily Drive, which will be installed within the road rights-of-way along with new line side services, valves, fire hydrants, and customer service tie-ins. The existing mains and customer services will be disconnected from the water system and abandoned in place. The project also includes abandonment of 1,390 LF of pipeline located within backyard easements between and parallel to: (1) Dumas Lane and Pan Springs Lane; and (2) Pan Springs Lane and Paradise Way. BBCCSD will coordinate with the property owners to establish the least disruptive alignment for each of the new connections (approximately 50 parcels).

Contact Information

Name
Jerry Griffith
Agency Name
Big Bear City Community Services District
Job Title
Water Superintendent
Contact Types
Lead/Public Agency

Location

Cities
Big Bear City
Counties
San Bernardino
Regions
Southern California
Cross Streets
SR-18/E North Shore Dr, Seguoia Dr, Paradise Way, Mt Diablo Dr., Hugo Lane, (see below)
Other Location Info
Cross Streets (cont)...Pan Springs Lane, E. Cinderella Drive

Notice of Determination

Approving Agency
Big Bear City Community Services District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
BBCCSD 139 E. Big Bear Blvd., Big Bear City, CA 92314

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print