San Francisco Bay Fiber Optic Cables Project

2 Documents in Project

Summary

SCH Number
2023040125
Lead Agency
California State Lands Commission (SLC)
Document Title
San Francisco Bay Fiber Optic Cables Project
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2023
Document Description
Installation, use, and maintenance of two 2-inch-diameter subsea fiber optic cables buried 3 to 6 feet and two 8-inch-diameter high-density polyethylene conduits installed 6.5 to 66 feet under the San Francisco Bay. The State Lands Commission action is an approval of a 25-year General Lease – Right-of-Way Use through April 30, 2048.

Contact Information

Name
Afifa Awan
Agency Name
State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Brisbane, San Leandro
Counties
Alameda, San Mateo
Regions
San Francisco Bay Area
Cross Streets
Lagoon Rd. & Sierra Point Pkwy. (west side) ; Fairway Dr. & Monarch Bay Dr. (east side)
Zip
94005
Total Acres
0.75 acres
Parcel #
005-162-430 and 080G-0910-001-06
State Highways
State Highway # 101
Railways
None
Airports
SF International; Oakland Intern
Schools
Brisbane Elementary School
Waterways
San Francisco Bay
Township
T03
Range
R04W
Section
18
Base
WGS 84
Other Location Info
There is a western side of the Project and an eastern side of the project. The western side of the Project's coordinates are above. The eastern side of the Project is at Township: T03; Range: R05W; Section: 13, and Base WGS 84.
Other Information
The eastern side of the Project is at Latitude: 37°41'14.48" N and Longitude: 122°10'50.82" W with WGS84 Datum.

Notice of Determination

Approving Agency
State Lands Commission
Approving Agency Role
Lead Agency
Approved On
County Clerks
Alameda, San Mateo
Final Environmental Document Available at
https://www.slc.ca.gov/content-types/san-francisco-bay-fiber-optic-cables-project/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print