Pacific Coast Bicycle Connectivity North Project (Lake or Streambed Alteration Agreement No. (EPIMS-SMO-42993-R3)

2 Documents in Project

Summary

SCH Number
2023030704
Lead Agency
City of Half Moon Bay
Document Title
Pacific Coast Bicycle Connectivity North Project (Lake or Streambed Alteration Agreement No. (EPIMS-SMO-42993-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The Project is limited to the construction of a 44-foot-long prefabricated bridge over Roosevelt Creek and associated raised boardwalks. Bridge abutments will be located above top-of-bank, Construction staging will be within the Caltrans right-of-way and in a nearby existing roadway pullout area.

Contact Information

Name
Wesley Stokes
Agency Name
CDFW
Job Title
Environmental Scientist Supervisor
Contact Types
Responsible Agency

Location

Cities
unincorporated area
Counties
San Mateo
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located along the east side of California State Route 1 (Highway 1), Post Mile (PM) 30.99, at Roosevelt Creek, a tributary to the Pacific Ocean, in the County of San Mateo, State of California; Latitude 37.49190, Longitude -122.45190.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print