High-Performance Battery Systems Manufacturing to Support Zero-Emission Transportation in California
Summary
SCH Number
2023030244
Public Agency
California Energy Commission
Document Title
High-Performance Battery Systems Manufacturing to Support Zero-Emission Transportation in California
Document Type
NOE - Notice of Exemption
Received
Posted
3/8/2023
Document Description
Cuberg, Inc. will establish a battery manufacturing facility in San Leandro, CA with operations to span raw materials
processing to battery module manufacturing with a targeted output of 200 megawatt-hours of battery production
annually (2.7 million battery cells per year)
Contact Information
Name
Pilar Anne Magana
Agency Name
California Energy Commission
Job Title
Air Pollution Specialist
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Leandro
Counties
Alameda
Regions
Northern California, San Francisco Bay Area
Cross Streets
Doolittle Drive and Merced Street
Zip
94577
Total Acres
Suites F-G
Jobs
300
Parcel #
077A-0644-001-06
State Highways
Interstate 880, 580, Highway 238
Railways
San Leandro Subway
Airports
Oakland International Airport
Schools
Corvallis Elementary School, John Muir Middle School
Waterways
San Francisco Bay, Lake Chabot
Other Location Info
Industrial Area
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
§15301 – “Existing Facilities”
Reasons for Exemption
The project will be located in San Leandro, CA next to Cuberg’s existing facility and is located in an industrial general zoning district suitable for the manufacturing activities that Cuberg will perform. The project scope includes converting the existing warehouse shell into a suitable 2019 California Building Code Group F occupancy building to house Cuberg’s battery manufacturing line. The construction work to be completed includes building demising walls and interior separations, electrical upgrades, adding core restrooms, adding HVAC systems, and structural/seismic upgrades. Once operations commence, the manufacturing work to be completed includes electrode coating, cell assembly, electrolyte filling, formation, conditioning, packaging and shipping. Therefore, the project falls within section 15301 and will not have a significant effect on the environment.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.