Castella Water Intake Replacement Project

2 Documents in Project

Summary

SCH Number
2023020554
Lead Agency
Shasta County
Document Title
Castella Water Intake Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2023
Document Description
Improvements include replacing an existing water intake structure within Castle Creek with an instream infiltration gallery, rehabilitation of an existing clearwell, installation of a new chemical injection vault, and replacing the existing electrical control system equipment with new efficient models. A new post-filter chlorination metering pump and day tank would be installed inside the WTP building, along with a new air compressor, new grating, and new filter and backwash control valves; a new post-filter chlorination vault and appurtenances would be installed to the north of the WTP building. A new surge tank would be installed on the east side of the building, and a new emergency generator and automatic transfer switch would be installed to the south of the WTP building.

Contact Information

Name
Venton Lee Trotter
Agency Name
Shasta County Department of Public Works
Job Title
Supervising Engineer
Contact Types
Lead/Public Agency

Location

Cities
Redding
Counties
Shasta
Regions
Northern California, Unincorporated
Cross Streets
Castella Loop Road
Zip
96017
Jobs
10
Parcel #
014-600-016
State Highways
Interstate 5
Railways
UPRR
Airports
n/a
Schools
Castle Rock Elementary
Waterways
Castle Creek, Sacramento River
Township
38N
Range
4W
Section
22

Notice of Determination

Approving Agency
Shasta County Department of Public Works
Approving Agency Role
Lead Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
1643 Market Street, Redding, CA 96001 or on-line at www.shastacounty.gov

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print