R-16.2 Reservoir and Booster Pumping Station Project

2 Documents in Project

Summary

SCH Number
2023020145
Lead Agency
Yucaipa Valley Water District
Document Title
R-16.2 Reservoir and Booster Pumping Station Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2023
Document Description
The Project generally consists of construction and operation of two 0.6 million-gallon (MG) potable water storage reservoirs to serve the 16 Pressure Zone, one 0.3 MG recycled water storage reservoir, one potable water booster pumping station configured and equipped to pump to the 17 Pressure Zone, one recycled water booster station configured and equipped to pump to the 17 Pressure Zone, a concrete drainage swale and a retention basin to convey and retain stormwater runoff on the site, approximately 480 linear feet of 16-inch diameter potable water pipeline, and approximately 450 linear feet of 12-inch diameter recycled water pipeline. The Project also includes demolition and removal of the existing potable water R-16.2 Reservoir.

Contact Information

Name
Jennifer ares
Agency Name
Yucaipa Valley Water District
Job Title
Water Resource Manager
Contact Types
Lead/Public Agency

Location

Cities
Yucaipa
Counties
San Bernardino
Regions
Citywide
Cross Streets
Oak Glen Road and James Birch Road
Zip
92399
Total Acres
less than 2 acre
Parcel #
0321-241-05
State Highways
n/a
Railways
n/a
Airports
n/a
Schools
Parkview Elementary, Ridgeview Elementary
Waterways
Oak Glen Creek
Township
1S
Range
1W
Section
29
Other Location Info
North side of Oak Glen Road

Notice of Determination

Approving Agency
Yucaipa Valley Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
www.yvwd.us

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print