Roy's Redwoods Restoration Project

2 Documents in Project

Summary

SCH Number
2023020117
Lead Agency
Marin County Open Space District (MCOSD)
Document Title
Roy's Redwoods Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2023
Document Description
The purpose of the proposed project is to implement the MCOSD Road and Trail Management Plan (RTMP) to provide the public with a safe multi-use trail system to enhance the visitor experience, reduce the environmental impacts on sensitive resources by reducing sedimentation and erosion, and establish a sustainable system of roads and trails that meet design and management standards and would provide year-round access along the trail alignment. The project includes the following elements, which are summarized below and fully described in the Project Description section of the IS/MND: Ecological and Hydrologic Restoration: Reestablish a multi-threaded Stage Zero wetland-channel complex to reconnect Upper Larsen Creek to its surrounding floodplain, reduce erosion, restore hydrologic functions, increase infiltration and raise the groundwater table, rehabilitate approximately 77,170 square feet of heavy visitor use areas throughout the valley floor to reduce soil compaction and increase conditions for natural regeneration of vegetation, halt development and persistence of incised channel reaches of Upper Larsen Creek through the valley floor using large and small wood structures, and re-orient existing fallen trees and downed branches and obtain and place additional logs, where needed, through the floodplain to improve natural hydrologic function by slowing and spreading water throughout the floodplain to allow flows to infiltrate into the soil. Trail Improvements: Upgrade and realign approximately 5,670 feet if existing trails to improve drainage, prevent future erosion and sedimentation, meet RTMP trail design standards and upgrade approximately 1,900 feet of existing trails to meet Marin County Parks Inclusive Access Plan standards for an Access and Discovery Trail. Parking and Entryway Improvements: Develop two new designated entryways and improve the existing entryway adjacent to Nicasio Valley Road, relocate the existing porta-toilet out of the floodplain and closer to the existing entryway, install one inclusive access parking spot on the shoulder of Nicasio Valley Road, and reinstall fencing along the Nicasio Valley Road shoulder. Social Trail Decommissioning: Decommission approximately 6,465 feet of existing social trails located in sensitive areas using passive trail closure methods and active methods that involve heavy equipment and hand tools. Visitor Education: Install new fencing and visitor information signage to notify visitors of closed trails and discourage development of new social trails, construct a Nature Exploration Area and Scramble, and provide visitor interpretive services and wayfinding signage.

Contact Information

Name
Jon Campo
Agency Name
Marin County Parks and Open Space District
Job Title
Principal Natural Resources Planner
Contact Types
Lead/Public Agency

Location

Counties
Marin
Regions
Northern California
Cross Streets
Nicasio Valley Road and Sir Francis Drake Blvd
Zip
94973
Total Acres
19.5
Parcel #
172-350-36
State Highways
none
Railways
None
Airports
None
Schools
San Geronimo Preschool, West Marin Montessori preschool
Waterways
Larsen Creek, San Geronimo Creek, Nicaso Creek
Township
02N
Range
07W
Section
17
Base
Diablo

Notice of Determination

Approving Agency
Marin County Parks and Open Space District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
Marin County Parks and Open Space District administrative office located at 3501 Civic Center Drive, Suite 260, San Rafael, CA 94903

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print