810 East Dunne Avenue Project

2 Documents in Project

Summary

SCH Number
2023020093
Lead Agency
City of Morgan Hill
Document Title
810 East Dunne Avenue Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The 1.07-acre project site, located at 810 East Dunne Avenue in the City of Morgan Hill, is currently developed with an existing Shell fueling station, car wash, and convenience store, featuring a fueling canopy comprised of seven fuel dispensers, a car wash, and paved surface parking. The Morgan Hill 2035 General Plan designates the site as Commercial and the site is zoned General Commercial (CG).
Document Description
The 810 East Dunne Avenue Project (proposed project) would include demolition of the existing Shell fueling station, car wash, and convenience store, and removal of two existing 15,000-gallon underground storage tanks (USTs). The project site would be redeveloped with a 5,007-square-foot (sf) convenience store, a 2,789-sf fueling canopy featuring four fuel dispensers to serve eight vehicles, a 1,733-sf car wash tunnel, a 250-sf car wash equipment room, and a 679-sf storage area. In addition, two new 20,000-gallon USTs would be installed on-site. The project would require City approval of a Conditional Use Permit, a Design Permit, and Lot Merger Map to merge the two lots into one. In addition, the project would require County of Santa Clara Hazardous Material Compliance Division approval of a UST System Closure Permit and UST Permit to Operate.

Contact Information

Name
Tiffany Brown
Agency Name
City of Morgan Hill, Development Services Department
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Morgan Hill
Counties
Santa Clara
Regions
Citywide, Countywide
Cross Streets
East Dunne Avenue and Walnut Grove Drive
Zip
95037
Total Acres
1.07
Parcel #
817-11-043 and -077
State Highways
101
Railways
UPRR
Airports
N/A
Schools
Barrett Elementary School, Nordstrom Elementary School, St. Cath
Waterways
Madrone Channel
Township
9S
Range
3E
Section
27
Base
MDBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water
Development Types
Commercial (Sq. Ft. 10458, Acres 1.07, Employees 1)
Local Actions
Use Permit, Lot Merger and Design Permit
Project Issues
Biological Resources, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Transportation, Vegetation

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print