Blue Canyon Pavement Rehabilitation

3 Documents in Project

Summary

SCH Number
2023020037
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Blue Canyon Pavement Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2023
Document Description
Caltrans proposes to enhance and preserve the useful life of the existing pavement and to improve the ride quality on eastbound (EB) I-80 in Placer County between PM R26.5 and 55.1 by grinding and overlaying the mainline. Operational improvement of the general-purpose lanes will be accomplished by constructing EB truck climbing lanes at three locations. To accommodate the truck climbing lanes, the roadway would be widened and two structures, the Blue Canyon undercrossing (UC) (Br.#19-0115R) and Weimar overcrossing (OC) (Br.#19-0082), would be removed and replaced with wider structures. Several entrance and exit ramps would also be reconstructed with the latest signing/striping standards for vehicles to properly merge into the new truck lane. Existing Traffic Management Systems (TMS) and Safety and Intelligent Transportation Systems (ITS) elements would be relocated and upgraded to current standards to actively manage recurrent and non-recurrent traffic congestion. All Metal Beam Guardrails (MGBR) would be replaced with Midwest Guardrail Systems (MGS); median concrete barriers, drainage, lighting, sign panels, and fiber optic would be upgraded as needed; and wildlife crossing conflicts would be addressed with the construction of a wildlife crossing.

Contact Information

Name
Cymbre Hoffman
Agency Name
California Department of Transportation
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
unincorporated area
Counties
Placer
Regions
Northern California
Other Information
I-80 post mile R26.5/55.1

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.