Highway 395 and Seneca Road Quick N Clean Car Wash
2 Documents in Project
Summary
SCH Number
2023020033
Lead Agency
City of Adelanto
Document Title
Highway 395 and Seneca Road Quick N Clean Car Wash
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2023
Document Description
The Applicant proposes to develop a 4,552-square-foot Quick N Clean Car Wash and appurtenant facilities (proposed project) on the approximately 1.60-acre site. The proposed project would provide 37 vacuum structures within 37 standard parking stalls and a 138-foot drive-through vehicle wash tunnel; three drive-through pay stations; and paved driveways. The vehicle wash tunnel would be 4,552 square feet and would use a water recycling system to reduce water usage. Paved surfaces would total 39,715 square feet and building setbacks and side yards would be provided around the perimeter of the site, including a 25-foot parking setback adjacent to US-395. The drive-through vehicle wash tunnel would be located on the eastern end of the site.
Contact Information
Name
Anna Rempala
Agency Name
3K1 Consulting Services, LLC
Job Title
Applicant
Contact Types
Project Applicant
Phone
Email
Name
Nyeka Allen
Agency Name
City of Adelanto
Job Title
Project Planner
Contact Types
Lead/Public Agency
Email
Location
Coordinates
Cities
Adelanto
Counties
San Bernardino
Regions
Citywide
Cross Streets
Seneca Road and US-395
Zip
92301
Total Acres
1.6
Jobs
7
Parcel #
310-351-105
State Highways
US-395, SR 18
Railways
none
Airports
none
Schools
Vista Verde Elementary School
Waterways
none
Township
T05N
Range
R05W
Base
Adelanto
Notice of Determination
Approving Agency
City of Adelanto
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
https://www.ci.adelanto.ca.us/377/CEQA-Process-Policy
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.