Santa Margarita 58 CAPM

5 Documents in Project

Summary

SCH Number
2023020025
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Santa Margarita 58 CAPM
Document Type
NOD - Notice of Determination
Received
Posted
8/22/2024
Document Description
Extend the service life and improve the ride quality of SR 58 near the town of Santa Margarita. The project proposes to overlay the roadway within the project limits with Rubberized Hot Mix Asphalt. Shoulder backing will be placed along pavement edges. The existing roadway has 11-foot-wide travel lanes with 1-to-2-foot shoulders. The project proposes to widen the roadway with12-foot lanes near the north side of I Street to West Pozo Road. Six-foot shoulders, sidewalks, and curbramps are proposed from I Street to West Pozo Road. Existing asphalt concrete dikes will be upgradedto meet existing standards. Additionally, 10 drainages and 36 roadside sign panels will be replaced, onecount station will be installed, and the existing metal beam guardrail will be replaced with the currentstandard on SR 58, in San Luis Obispo County.

Contact Information

Name
Brigitte Driller
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Location

Counties
San Luis Obispo
Regions
Southern California
State Highways
SR 58
Other Location Info
State Route (SR) 58, from postmile (PM) 1.8 to PM 6.9, in San Luis Obispo County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.