Hembree Lane Oaks Subdivision (Lake or Streambed Alteration Agreement No. EPIMS- SON-42947- R3)

3 Documents in Project

Summary

SCH Number
2023020001
Lead Agency
Town of Windsor
Document Title
Hembree Lane Oaks Subdivision (Lake or Streambed Alteration Agreement No. EPIMS- SON-42947- R3)
Document Type
NOD - Notice of Determination
Received
Posted
5/28/2024
Document Description
The project is limited to the filling of one seasonal tributary (drainage), partially filling of multiple areas of one seasonal wetland with surface flow connection to the seasonal drainage, and removal of riparian vegetation from the development of residential housing and the extension of Country Meadow Drive. The project will also install a new headwall and 287 square feet of rip-rap for a relocated inlet into the city storm drain system below Country Meadow Drive. The project will result in permanent impacts to 0.07 acre of wetlands, 0.01 acre (400 square feet) and 20 linear feet of stream, and 0.06 acre of riparian vegetation. The project will not result in temporary impacts. The project will also result in the removal of seven riparian trees.

Contact Information

Name
Nick Wagner
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Windsor
Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at an unnamed tributary to Pool Creek, in the County Sonoma, State of California; Latitude 38.535897, Longitude -122.79524; 7842 Hembree Lane, Windsor, CA, 95492; Assessor’s Parcel Number 163-080-047.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print