Altamira Canyon Creek Restoration Project

2 Documents in Project

Summary

SCH Number
2023010506
Lead Agency
City of Rancho Palos Verdes
Document Title
Altamira Canyon Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2023
Document Description
In 2015, due to approx. two decades of severe erosion of the embankments of Altamira Canyon Creek resulting from high storm flows, the applicant installed gabion baskets along the eastern bank of the creek and along the northern bank of an unnamed drainage to prevent further loss of property and protect the animals in the equestrian facilities abutting the drainages. The gabions were installed without proper permits from the USACE, CDFW, and LARWQCB. Subsequently, a notice of violation for failure to obtain a Section 401 Water Quality Certification was issued. The property owner was directed to conduct required biological and engineering studies to support the regulatory permitting process. Accordingly, the applicant proposes the removal of most of the existing gabions, foundation, grout, and grouted stones that were installed; restoration of the exposed channel bank; removal and restoration of channel protection; repair of any surface slump; reinforcement of a section of the slope with erosion control mats, riprap, and earthen fill; and habitat restoration.

Contact Information

Name
Amy Seeraty
Agency Name
City of Rancho Palos Verdes
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Thierry Montoya
Agency Name
Frost Brown Todd
Job Title
Attorney
Contact Types
Project Applicant

Location

Cities
Rancho Palos Verdes
Counties
Los Angeles
Regions
Citywide
Zip
90275
Parcel #
7572-013-016, 7572-013-015, and 7572-011-025
Other Information
Addresses are 25 and 26 Sweetbay Road

Notice of Determination

Approving Agency
City of Rancho Palos Vercdes
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.rpvca.gov/1586/Altamira-Canyon-Creek-Restoration-Projec

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Habitat Mitigation and Monitoring Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print