Canyon Tunnel Project Addendum
5 Documents in Project
Summary
SCH Number
2023010504
Lead Agency
South San Joaquin Irrigation District
Document Title
Canyon Tunnel Project Addendum
Document Type
NOD - Notice of Determination
Received
Posted
3/13/2025
Document Description
The work would include temporary construction access, laydown, and staging areas; permanent downstream tunnel portal and tie-in to the existing canal; approximately 12,106 lineal feet of new tunnel; permanent upstream tunnel portal and tie-in to the existing Goodwin Reservoir; and permanent access improvements leading to the existing Goodwin Dam right abutment:
The Project specifically includes the following components:
• Construction of approximately 12,106 feet tunnel; approximately 20-foot diameter
with a flat floor;
• Use of existing roads paved and dirt roads to be rehabilitated where necessary;
• Rehabilitation of an existing boat ramp and new boat landing:
o Rehabilitation of the existing boat ramp would be constructed at the same
location and with a slightly larger footprint at the south shore of Goodwin
Dam Reservoir at the current parking lot location;
o Construction of a new boat landing and tunnel inlet access road at the north
shore of Goodwin Dam Reservoir;
o Protective cofferdams would be used to dewater around the existing boat
ramp, boat landing and tunnel inlet during construction;
• Improve and re-align existing livestock fences including barbed wire fencing and
panel gates;
• Tunnel inlet would start on the north side of the reservoir, upstream of the dam,
above the existing diversion canal and on the dry side of the forebay and trash
rack;
• Installation of new control gates at the tunnel inlet;
o The tunnel size would be approximately 16 feet in diameter along the
majority of its length, with some areas slightly larger to accommodate
hydraulics and portal transitions;
• Temporary installation of a coffer dam at the existing trash rack for forebay
dewatering;
• Installation of a concrete cover cap over the existing forebay to provide rockfall
protection;
• Existing ram pump to be abandoned;
• Proposed vertical conduit to be drilled vertically to tunnel for upland property
owner (well with steel casing, removable screen and sump at tunnel
sidewall, submersible solar power pump);
• Existing canal gates at dam to remain for side-spill
• Existing canal inlet gates to be abandoned
• Tunnel Outlet would be located at the southwest end of the Project area at the
downstream portal.
• The proposed Canyon Tunnel would bypass the existing canal for approximately
12,250 feet and tie back into the existing canal through a downstream tunnel
portal.
Construction Phases are as follows and are referenced throughout the document:
1. Excavate Downstream Portal Work Area
2. Shotcrete Portal Face
3. Excavate First 800 LF D + S
4. Tunnel Excavation, Stage 1 Shotcrete
5. Stage 2 Shotcrete
6. Place Concrete Slab D+S and Invert Concrete
7. Tunnel Cleanup
8. Excavate Upstream Portal Work Area
9. Shotcrete Upstream Shoring Walls
10. Construction Concrete Intake Structure
11. Tie-In Canal Facilities
Contact Information
Name
Forrest Killingsworth
Agency Name
South San Joaquin Irrigation District
Job Title
Engineering Department Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Counties
Calaveras, Stanislaus, Tuolumne
Regions
Northern California
Parcel #
053-021-003, 053-021-011, 053-021-WOW, 002-073-001, 002-073-003, 002-063.017, 063-120-24 & 27
Waterways
Stanislaus River
Notice of Determination
Approving Agency
South San Joaquin Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerks
Calaveras, Stanislaus, Tuolumne
Final Environmental Document Available at
South San Joaquin Irrigation District, 11011 E. Highway 120, Manteca, CA 95336
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.