McKinley Elementary School Campus Master Plan Project – Environmental Impact Report Addendum
5 Documents in Project
Summary
SCH Number
2023010230
Lead Agency
Santa Monica-Malibu Unified School District
Document Title
McKinley Elementary School Campus Master Plan Project – Environmental Impact Report Addendum
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2024
Document Description
The EIR Addendum addresses modification of previously adopted Mitigation Measure HAZ-2 to reflect cleanup activities identified in the draft Removal Action Work Plan (RAW) prepared in coordination with the California Department of Toxic Substances Control (DTSC), to minimize impacts related to chemicals of concern (COCs) that were identified in soil and soil vapor. The modification to MM HAZ-2 corresponds with a change in the remedial approach from what had previously been anticipated during preparation of the Certified EIR (i.e., excavation and off-site disposal of impacted soils), through containment, capping-in-place plus, and installation of a VIMMEC to address impacted soil vapor. No other changes to the Project as approved are proposed.
Contact Information
Name
Carey Upton
Agency Name
Santa Monica-Malibu Unified School District
Job Title
Chief Operations Officer
Contact Types
Lead/Public Agency
Email
Location
Cities
Santa Monica
Counties
Los Angeles
Regions
Citywide
Cross Streets
Santa Monica Boulevard and Chelsea Avenue
Zip
90404
Total Acres
6.48
Parcel #
4276-023-900
State Highways
I-10 and Pacific Coast Highway
Railways
Metro E Line (Expo)
Airports
Santa Monica Airport
Schools
Multiple
Notice of Determination
Approving Agency
Santa Monica-Malibu Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Santa Monica–Malibu Unified School District, 1717 Fourth Street, Santa Monica, CA 90401;
SMMUSD website: https://www.smmusd.org/Page/5594
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.