Grant Elementary School Campus Master Plan Project

3 Documents in Project

Summary

SCH Number
2023010229
Lead Agency
Santa Monica-Malibu Unified School District
Document Title
Grant Elementary School Campus Master Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2024
Document Description
The Proposed Project would renovate and modernize Grant ES campus to update the campus facility to align with the Districtwide Educational Specifications. The Proposed Project would develop new and renovated facilities that would support a modern project-based learning approach at Grant ES that would shift the instructional design of the past—defined by a traditional teacher-at-the-front-of-the-classroom style of learning—to one that provides for rotational learning in the classroom, incorporating a variety of project-based learning experiences that allow simultaneous individualized, small group, and large group instruction. Learning spaces would be adapted with enhanced flexibility, mobility, and access to technology and resources in real time, where instructors and students may shift seamlessly between programs and instructional opportunities. The Districtwide Education Specifications also call for larger classrooms, more and larger multipurpose rooms, and several new shared spaces that do not currently exist. The redesigned campus would have more square feet of interior space. The Proposed Project, which involves implementation of a Campus Master Plan, would be constructed in three phases on approximately 5.41 acres of the 6.01-acre campus. Redevelopment and modernization of Grant ES includes the demolition and removal of some existing structures, renovation of three remaining structures, construction of two new buildings, new and reconfigured playfields and playgrounds, two new and reconfigured parking lots, and a new community plaza. Ten existing modular and relocatable classroom buildings (P70 through P79), one modular building (playground restrooms), shade structures, and a portion of one permanent classroom building (Building B) would be selectively demolished and removed as part of the Proposed Project, for a total of 76,415 square feet of demolition. The other buildings would remain as is. The Proposed Project would include renovation and expansion of the existing library (Building F), which would be combined with Building G to create a new Library and Maker space; interior renovation of the transitional kindergarten and kindergarten classrooms (Building A); and improvements to the Central Garden. The Proposed Project would include the construction of two new classroom buildings to replace the 10 portable classrooms that would be removed. Improvements to outdoor recreational areas and relocation and reconfiguration of the parking lot would also be implemented. The Proposed Project would reconfigure the existing L-shaped parking lot into two new parking lots at the southeast and southwest corners of the campus. Each parking lot would include approximately 40 parking stalls and would provide staff and after-hours/weekend community parking for joint use purposes. Thus, the Proposed Project would increase parking on the existing campus from 62 to 80 parking spaces. The Proposed Project would also include a new community plaza on the location of the existing visitor and administration parking lot, along Pearl Street. Implementation of the community plaza would eliminate all 14 parking spaces on the existing parking lot during Phase 3 of the Proposed Project. The proposed community plaza would serve as drop-off and pick-up area and would be accessible to pedestrians and bicyclists only, via 24th Court. The Proposed Project would maintain the drop-off and pick-up area at the front of the campus along Pearl Street. The Proposed Project would include a new arrival court at the southern end of the campus, adjacent to the reconfigured playfield, that would connect the two new parking lots to 24th Street and would also be accessible to pedestrians and bicyclists only. The new arrival court would provide safe access to the campus for students who walk or bike to campus, and arrive from 24th Street, to avoid having to cross vehicular circulation within the new parking lots. The arrival court would not be used to for vehicular drop off/pick up.

Contact Information

Name
Carey Upton
Agency Name
Santa Monica-Malibu Unified School District
Job Title
Chief Operations Officer
Contact Types
Lead/Public Agency

Location

Cities
Santa Monica
Counties
Los Angeles
Regions
Citywide
Cross Streets
Pearl Street and 24th Court
Zip
90405
Total Acres
6.01
Parcel #
4273-009-900
State Highways
I-10 and Pacific Coast Highway
Railways
Metro E Line (Expo)
Airports
Santa Monica Airport
Schools
Multiple
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Santa Monica-Malibu Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Santa Monica-Malibu Unified School District, 1717 Fourth Street, Santa Monica, CA 90401; SMMUSD website: https://www.smmusd.org/Page/5592

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print