Coachella Mid-Canal Storage Project

3 Documents in Project

Summary

SCH Number
2022120628
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Coachella Mid-Canal Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2023
Document Description
The project consists of creating a single wide channel by joining two existing parallel canal channels, one of the original earthen canal constructed In the 1940s, and the second concrete-lined canal constructed in 2005 as a part of the Coachella Canal Lining Project (CCLP). All earthwork required to join the two channels and create the storage reservoir will be conducted within the existing fence lines defining boundaries of the federal right-of-way within which the parallel canals are located. The project will provide up to 728 acre-feet of water storage to alleviate water storage deficiencies and Increase water storage capacity, reliability, and efficiency within the CVWD water distribution system.

Contact Information

Name
Summer Adleberg
Agency Name
San Diego County Water Authority
Job Title
Principal Water Resources Specialist
Contact Types
Responsible Agency

Location

Cities
Community of Wister
Counties
Imperial
Parcel #
003-050-018;003-050-025;003-120-014;003-120-022;003-130-006;003-200-047;003-210-001
Township
9S
Range
14E
Section
36
Base
Wister

Notice of Determination

Approving Agency
San Diego County Water Authority
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
www.sdcwa.org/projects-programs/programs/environmental/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print