P Street Lift Station Project

2 Documents in Project

Summary

SCH Number
2022120579
Lead Agency
City of Live Oak
Document Title
P Street Lift Station Project
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2023
Document Description
The Project consists of the demolition of approximately 0.14 miles of existing sewage and storm drain pipelines; construction of a new wet wall, installation of three new pumps, valves, piping, and a flowmeter with associated vaults; replacement of the existing motor control center, backup generator, and other electrical improvements; replacement of gravity wastewater piping and structures; a new perimeter CMU wall with two access gates; improvements to the electrical and controls building including a new roof; asphalt paving of the Site; drainage infrastructure within the adjacent roadway ROW of Date Street and P Street; the installation of a new box culvert within the drainage ditch onsite (between the lift station and the proposed staging area); and other various improvements.

Contact Information

Name
Kevin Valente
Agency Name
Raney Planning and Management Inc
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Ron Walker
Agency Name
City of Live Oak
Job Title
Public Works Director
Contact Types
Lead/Public Agency

Location

Cities
Live Oak
Counties
Sutter
Regions
Citywide
Cross Streets
P Street and Date Street
Zip
95953
Total Acres
0.5
Parcel #
006-241-001 and 006-241-002
State Highways
California
Township
Live O

Notice of Determination

Approving Agency
City of Live Oak
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
9955 Live Oak Blvd, Live Oak, CA 95953; https://www.liveoakcity.org/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print