Toluca-Hollywood Line 1 Upgrade

2 Documents in Project

Summary

SCH Number
2022120355
Lead Agency
Los Angeles Department of Water and Power
Document Title
Toluca-Hollywood Line 1 Upgrade
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2023
Document Description
The City of Los Angeles Department of Water and Power (LADWP) proposes to upgrade an approximately 1.8-mile portion of the existing Toluca–Hollywood 230 kilovolt (kV) Transmission Line 1 (TOL–HWD L1) cable, which runs underground within a pipe from the Nichols Canyon Terminal Tower to the Hollywood Receiving Station. All work would be located within the road right-of-way (ROW), the confines of LADWP property, or within an easement. The proposed TOL-HWD L1 Upgrade Project (proposed project) would include trenching and installing a new underground cable adjacent to the existing underground TOL-HWD L1 alignment from Hollywood Boulevard southeast to the Hollywood Receiving Station. The project also would include trenching and removing the existing underground TOL-HWD L1 pipe and cable and installing a new underground pipe and cable inside the same trench alignment within Nichols Canyon Road, north of Hollywood Boulevard to the Nichols Canyon Terminal Tower. Additionally, an existing transmission tower along the existing TOL-HWD L1 would be raised, and a portion of an existing Burbank Water and Power (BWP) distribution line that crosses under the TOL-HWD L1 would be lowered. To accommodate the system upgrade, modifications to the Nichols Canyon Terminal Tower and the Hollywood Receiving Station are proposed.

Contact Information

Name
Marshall Styers
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Citywide
Zip
90046
Total Acres
1.8 linear miles
State Highways
CA-2, CA-170, CA-134, US-101
Railways
Ventura County Line
Airports
Hollywood-Burbank Airport
Schools
Hollywood Schoolhouse, The Oaks School, Melrose Elementary
Township
01S
Range
14W
Section
9

Notice of Determination

Approving Agency
Los Angeles Department of Water and Power
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
www.ladwp.com/envnotices

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.