Ventura Yacht Club Dock Replacement Project

2 Documents in Project

Summary

SCH Number
2022120321
Lead Agency
Ventura Port District
Document Title
Ventura Yacht Club Dock Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2023
Document Description
The Ventura Yacht Club Dock Replacement Project (Project) would demolish and replace the existing main walkway of docks B and D, and their associated fingers, slips, and pilings with new docks and associated features that are compliant with the Guidelines for Marina Berthing Facilities published by the California Department of Boating and Waterways. The Project would incorporate new guide piles compliant with the Ventura Port District Ordinance for sea level rise resilience. The new docks would be outfitted with upgraded electrical and potable utility lines, and a Class II fire suppression system would be installed within the Ventura Yacht Club property and along the new docks. In addition, the Project would include a new ADA-compliant abutment gangway.

Contact Information

Name
Jessica Rauch
Agency Name
Ventura Port District
Job Title
Executive Assistant/Clerk of the Board
Contact Types
Lead/Public Agency

Location

Cities
Ventura
Counties
Ventura
Regions
Citywide
Cross Streets
Spinnaker Drive/East Harbor Boulevard
Zip
93001
Total Acres
1.17
Parcel #
080024023
State Highways
101
Schools
Pierpont Elementary School
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Ventura Port District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
1603 Anchors Way Drive, Ventura, CA 93001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print