BVPP East Side Parking Lot Lights

Summary

SCH Number
2022120197
Public Agency
California Department of Water Resources (DWR)
Document Title
BVPP East Side Parking Lot Lights
Document Type
NOE - Notice of Exemption
Received
Posted
12/9/2022
Document Description
SJDF plans to add lights to the east side of the Buena Vista Pumping Plant parking lot. To do this staff will use an asphalt saw to cut and remove a 1 foot wide by 100-foot-long section of asphalt. Then, in the area where asphalt was removed, they will use a hydro excavation truck to excavate a 2-foot-deep trench. They will also excavate a 1 foot wide by 80-foot-long area in an existing flower bed. Using the hydro excavation truck, they will a dig 2 feet deep trench in that area. After excavation is complete, electricians will run conduits within the trenches. Afterwards, a dump truck will be used to bring in road base to fill the trenches. A backhoe, water truck, and Wacker packer will be used to compact the area. Lastly, new asphalt will be placed in the areas where it was removed. Existing soil will also be used to backfill the trenches in the flower bed. All work will take place within DWR’s right of way. This work is necessary to provide light to staff, so they may safely get to and from work, and be available to run the plant at all hours of the day.

Contact Information

Name
Elizabeth Maldonado
Agency Name
Department of Water Resources, San Joaquin Field Division
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Taft
Counties
Kern
Regions
Countywide
Other Location Info
All work will take place in the east side of the Buena Vista Pumping Plant parking lot (35°09'37.5"N, 119°20'47.2"W). Buena Vista Pumping Plant is located at mile point 250.99 of the State Water Project.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 (b)
Reasons for Exemption
This project consists of maintenance activities that support the function of the California Aqueduct and water delivery within the State Water Project.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.