Lake McClure Raw Water Intake Pump Station
Summary
SCH Number
2022110472
Public Agency
California Regional Water Quality Control Board, Central Valley Fresno Region 5
(RWQCB)
Document Title
Lake McClure Raw Water Intake Pump Station
Document Type
NOE - Notice of Exemption
Received
Posted
11/21/2022
Document Description
The project would remove, replace, and upgrade the existing pump station components, including the existing 420 linear feet of pipeline, existing pump facilities, check and gate valves, pipe fittings, and electrical controls for the system. Two high-strength, low-alloy steel pipes, each 12 inches in diameter, would be installed, extending into the lake to a depth of 540 feet amsl
Contact Information
Name
Brandon Salazar
Agency Name
Regional Water Quality Control Board, Central Valley Region
Job Title
Water Resource Control Engineer
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Lake Don Pedro
Counties
Mariposa
Regions
Northern California
Waterways
Lake McClure
Notice of Exemption
Exempt Status
Emergency Project
Type, Section or Code
Sec. 21080(b)(4)
Reasons for Exemption
The project is related to the ongoing drought emergency in California. The project is needed to ensure a permanent water supply for the Lake Don Pedo Community Services District in light of falling water surface levels in Lake McClure.
County Clerk
Mariposa
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.