Yuba River Development Project FERC Relicensing

Summary

SCH Number
2022110118
Lead Agency
Yuba County Water Agency
Document Title
Yuba River Development Project FERC Relicensing
Document Type
NOI - Notice of Intent
Received
Present Land Use
Forest, Timberland Preserve, Agricultural, Rural Residential, Rural, Recreational
Document Description
Notice of Intent to Rely on FERC/USACE Final Environmental Impact Statement, in Combination with a Supplemental Analysis, to Satisfy CEQA for the Yuba River Development Project Relicensing The Yuba River Development Project (FERC No. 2246) is located in Yuba, Sierra, and Nevada Counties, California. The project comprises three developments—New Colgate, New Bullards Bar Minimum Flow, and Narrows 2—with a combined capacity of 361.9 megawatts and generates an average of about 1,418 gigawatt-hours of energy annually. The project affects 7,815.2 acres: 4,416.7 acres within the Plumas and Tahoe National Forests administered by the U.S. Department of Agriculture, Forest Service; 16.1 acres that are administered by U.S. Army Corps of Engineers associated with the Englebright Dam and Reservoir; 20.1 acres owned by the State of California; 3,149.3 acres managed by the Yuba County Water Agency (YCWA); and 213 acres of privately-owned land. The YCWA proposes to implement measures to protect and enhance environmental conditions. YCWA proposes to maintain all existing facilities with modifications to project operation, including increased capacities of outlets to accommodate proposed increased minimum flows. Also, YCWA proposes to add (1) the New Bullards Bar Dam auxiliary flood control outlet and (2) the New Colgate Powerhouse tailwater depression system.

Contact Information

Name
John James
Agency Name
Yuba Water Agency
Job Title
Director of Resource Planning
Contact Types
Lead/Public Agency

Location

Cities
Grass Valley, Loyalton, Marysville, Nevada City, Truckee, Wheatland
Counties
Nevada, Sierra, Yuba
Regions
Countywide
Zip
94596
Total Acres
7,815.2
State Highways
49, 20
Airports
Nevada County Airport
Schools
Yuba Feather Elementary, Foothill Intermediate School
Waterways
Yuba River, North Yuba River, Middle Yuba River, Oregon Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, Sierra Nevada Conservancy, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), State Water Resources Control Board, Division of Water Rights
State Reviewing Agency Comments
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), State Water Resources Control Board, Division of Water Rights
Development Types
Power:Hydroelectric (Megawatts 361.9)
Local Actions
Relicensing
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print