PLNP2021-00262 Jesuit High School Stadium Lighting
5 Documents in Project
Summary
SCH Number
2022100645
Lead Agency
Sacramento County
Document Title
PLNP2021-00262 Jesuit High School Stadium Lighting
Document Type
NOD - Notice of Determination
Received
Posted
3/12/2024
Document Description
1. A Use Permit Amendment to PLNP2018-00190 to allow stadium lighting on the Jesuit High School athletic field in the Residential 4 (RD-4) zoning district.
2. A Design Review to determine substantial compliance with the Sacramento County Countywide Design Guidelines (Design Guidelines).
The project will install four permanent stadium light poles at the Marauder Stadium. Two of the light poles, located on the north side of the stadium, would be 100-feet high. The other two (2) light poles, located on the south side of the stadium, would be 90-feet high. The proposed light poles will have LED lights affixed to the top, and will be located approximately at the 10-yard lines of the football field. The request also includes additional code-compliant lighting for the bleachers and pedestrian pathways of the stadium.
Contact Information
Name
Julie Newton
Agency Name
Sacramento County Planning
Job Title
ENVIRONMENTAL COORDINATOR
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
289-0210-045-0000
Notice of Determination
Approving Agency
Sacramento County Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.