Rotary Manor Culvert Replacement Project

3 Documents in Project

Summary

SCH Number
2022100506
Lead Agency
City of San Rafael
Document Title
Rotary Manor Culvert Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2022
Document Description
The project would involve replacing an existing corroded corrugated metal pipe (CMP) with a new reinforced concrete box culvert (RCB) in the southeast yard of Rotary Manor along Fifth Avenue. The replacement would require relocation of an underground PG&E gas pipeline and diversion and/or bypass pumping of surface and groundwater around the project site, and sawcut and partial demolition of the existing downstream endwall. Approximately 45 linear feet of eight by six feet RCB culvert would be installed, and concrete would be formed and poured at the hinge point interface between the existing and new culverts and between the new RCB and existing endwall. Backfill of the culvert trench would utilize concrete slurry, native paved backfill material, and planting soil. After installation, the existing trellis would be rebuilt and landscaped, and irrigation systems would be restored in the southeast yard.

Contact Information

Name
Raed Al-Zaher
Agency Name
City of San Rafael
Job Title
Project Manager
Contact Types
Lead/Public Agency

Location

Cities
San Rafael
Counties
Marin
Regions
Citywide
Cross Streets
Fifth Avenue
Zip
94901
Parcel #
010-291-71
State Highways
101
Railways
none
Airports
none
Schools
various
Waterways
San Rafael Creek, San Rafael Bay, Corte Madera Creek

Notice of Determination

Approving Agency
City of San Rafael
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
https://www.cityofsanrafael.org/rotary-manor-culvert-replacement/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.