Surfers Beach Pilot Restoration Project

2 Documents in Project

Summary

SCH Number
2022100439
Lead Agency
San Mateo County Harbor District
Document Title
Surfers Beach Pilot Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2022
Document Description
The proposed project is located at Pillar Point Harbor and Surfers Beach in City of Half Moon Bay just south of the Harbor and west of the unincorporated community of El Granada. The proposed Project would involve dredging of up to 100,000 cubic yards (CY) of clean sand accumulated along the inside of Pillar Point Harbor’s East Breakwater and a one- time placement of that sand to form an elevated berm along an approximately 1,000-foot-long section of shoreline at Surfers Beach in Half Moon Bay. Permitting level (30%) engineering design plans are available, which include the precise details of the dredging and sand placement activities. The purpose of the project is to address erosion at Surfers Beach by restoring sandy beach area using clean sand dredged from navigable areas of Pillar Point Harbor, including the boat launch ramp.

Contact Information

Name
James Pruett
Agency Name
San Mateo County Harbor District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Name
Brad Damitz
Agency Name
Brad Damitz
Job Title
Consultant to Harbor District
Contact Types
Project Applicant

Location

Cities
Half Moon Bay
Counties
San Mateo
Regions
San Francisco Bay Area
Cross Streets
Highway 1 and Capistrano Rd.
Zip
94018
Total Acres
28
Jobs
15
Parcel #
047-263-020, 047-390-030, 047-390-020
State Highways
Highway 1
Airports
Half Moon Bay Airport

Notice of Determination

Approving Agency
San Mateo County Harbor District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
Harbormaster Office, One Johnson Pier Rd., El Granada, CA 94016

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.