Notre Dame Boulevard Bridge Project

4 Documents in Project

Summary

SCH Number
2022100388
Lead Agency
City of Chico
Document Title
Notre Dame Boulevard Bridge Project
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2023
Document Description
The Project will construct a new bridge to connect the existing sections of Notre Dame Boulevard over Little Chico Creek. The new structure will accommodate two 12-foot travel lanes separated by a 6-foot-wide center median, eight-foot bike lanes, a five-foot sidewalk on the west side and an eight-foot multi-use path on the east side. The new bridge is anticipated to be a multi-span structure, approximately 100 feet long and 56 feet wide. The structure type is expected to be a three-span, cast-in-place, reinforced concrete bridge and will include rock slope protection at the banks under and adjacent to the bridge. In addition to the bridge, the existing bike path on the south side of the creek will be rerouted to a new bridge undercrossing and will connect to the multi-use path crossing the bridge.

Contact Information

Name
Lynn Coster
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Chico
Counties
Butte
Regions
Northern California
Parcel #
002-180-141, 002-180-111, 002-180-097
Township
22 N
Range
2 E
Section
30
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration /Environmental Impact Report is available to the general public at: CEQAnet.opr.ca.gov (http//CEQAnet.opr.ca.gov).

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print