Feather River Salmonid Habitat Improvement Project
5 Documents in Project
Summary
SCH Number
2022100104
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Feather River Salmonid Habitat Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2023
Document Description
The proposed project consists of addition or replacement of approximately 16,000 cubic yards of spawning gravel to multiple locations within the river to improve spawning conditions in these areas; excavation of approximately 100 cubic yards of accumulated streambed material from the entrance of Moe’s Side Channel; excavation of approximately 700 cubic yards of accumulated streambed material from the entrance and exit of the Bedrock Park Side Channel; and minor spoiling of approximately 100 cubic yards of excavated material in an area adjacent to the exit of the Bedrock Park Side Channel.
Contact Information
Name
Lynn Coster
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Oroville
Counties
Butte
Regions
Northern California
Parcel #
031-100-015, 031-110-035, 012-010-999, 012-010-028, 035-290-024, 035-290-018, 035-290-019
Township
19 N
Range
4 E
Section
7, 8
Base
MDB&M
Notice of Determination
Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration /Environmental Impact Report is available to the general public at: http//CEQAnet.opr.ca.gov.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.