City of Sanger New Water Well

3 Documents in Project

Summary

SCH Number
2022090633
Lead Agency
City of Sanger
Document Title
City of Sanger New Water Well
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2023
Document Description
The Project includes construction and operation of a new municipal water well, which would occur in three phases. The first phase would be the construction of a test well to determine the potential capacity of the well and to test the water quality of the aquifer. If the capacity of the well and the water quality meet drinking water standards, then the second phase for drilling and developing the well would occur. This phase would drill the well hole and install blank and louvered casing to the necessary depths for the well. It is assumed that the well would be drilled to a depth of approximately 700 feet, based on other similar city wells. The third and last phase would include the installation of a pump house, drive motor, discharge line, sand separator, emergency generator, site lighting, electrical equipment, and other site improvements. The new well may produce up to 2,500 gallons per minute and will help provide water supply and pressure requirements for the area.

Contact Information

Name
Sarah Adler
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Sanger
Counties
Fresno
Regions
Citywide
Cross Streets
Greenwood/North or Academy/Butler
Zip
93657

Notice of Determination

Approving Agency
State Water Board, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
State Water Board, Division of Financial Assistance

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.