Madera Lake Pump and Pipeline Project

3 Documents in Project

Summary

SCH Number
2022090367
Lead Agency
Madera Water District (MWD)
Document Title
Madera Lake Pump and Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Madera County General Plan Designation Onsite AE-Agriculture Exclusive, OS-Open Space Adjacent Lands AE-Agriculture Exclusive, OS-Open Space Project Area Zone District Onsite ARE-40-Ag Rural Exclusive, 40-ac. minimum parcel size, POS- Public Open Space Adjacent Lands ARE-40-Ag Rural Exclusive, 40-ac. minimum parcel size, ARE- 20-Ag Rural Exclusive, 20-ac. minimum parcel size, POS-Public Open Space
Document Description
Madera Water District (MWD) proposes to develop a project that would allow water from Madera Irrigation District (MID) or other sources to be brought into MWD through Madera Lake. Madera Lake is supplied by an existing turnout off the Fresno River which is fed by the upstream watershed regulated by Hidden Dam on Hensley Lake and from water from the Madera Canal. Water supplies could be from the Central Valley Project Friant Division, Fresno River, or pre-1914 supplies. The Project entails the installation of a 26 to 30-inch steel siphon in Madera Lake, booster pumps and pipeline to obtain a flowrate of up to 8,000 gpm from Madera Lake, with up to 6,000 gpm delivered into Madera Water District and up to 2,000 gpm delivered to the neighboring property from outside water supplies.

Contact Information

Name
John Gies
Agency Name
Madera Water District
Job Title
District Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Amy Wilson
Agency Name
Provost & Pritchard Consulting
Job Title
Senior Planner
Contact Types
Consulting Firm

Location

Cities
Madera
Counties
Madera
Regions
Citywide
Cross Streets
Avenue 21 is 1 .41 miles north of APE and Road 28 1/2 is 0.98 miles west of APE
Parcel #
031-151-010, 131-151-002, 031-191- 001, 031-192-001, 031-151-013 and 031-151-014
State Highways
SR 145, SR 99
Railways
NA
Airports
NA
Schools
Berenda Elementary School
Waterways
Fresno River
Township
10&11S
Range
18E
Section
28, 33
Base
MDB&M
Other Location Info
Madera Water District (MWD) proposes to develop a project that would allow water from Madera Irrigation District (MID) or other sources to be brought into MWD through Madera Lake. Madera Lake is supplied by an existing turnout off the Fresno River which is fed by the upstream watershed regulated by Hidden Dam on Hensley Lake and from water from the Madera Canal. Water supplies could be from the Central Valley Project Friant Division, Fresno River, or pre-1914 supplies. The Project entails the installation of a 26 to 30-inch steel siphon in Madera Lake, booster pumps and pipeline to obtain a flowrate of up to 8,000 gpm from Madera Lake, with up to 6,000 gpm delivered into Madera Water District and up to 2,000 gpm delivered to the neighboring property from outside water supplies.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Transportation, District 6 (DOT), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Water Resources (DWR), California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Water Resources (DWR), California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Other (Water Facilities - Pump and Pipeline)
Local Actions
District Action
Project Issues
Biological Resources, Cultural Resources, Tribal Cultural Resources

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print