Addendum to Water Reclamation Facility Project EIR - California Polytechnic State University, San Luis Obispo

4 Documents in Project

Summary

SCH Number
2022090231
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Addendum to Water Reclamation Facility Project EIR - California Polytechnic State University, San Luis Obispo
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2025
Document Description
The previously approved project, evaluated in the Cal Poly WRF Cal Poly WRF EIR, included construction of an on-campus WRF and a recycled water storage and distribution system to produce and deliver disinfected tertiary recycled water that meets the requirements of California Code of Regulations. With refinements in design and planning, the WRF would be located on vacant lands northeast of the recycled water storage reservoir, rather than north of the creamery and west of the rodeo. With this modified design, swine waste would be collected in two manure storage tanks, rather than conveyed to the storage pond for treatment with dairy waste. In addition, based on further analyses, the upper lift station would be eliminated from the project because the lower lift station would be adequate to address project needs for conveyance.

Contact Information

Name
Scott Bloom
Agency Name
Cal Poly State University
Job Title
Campus Planner
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Regions
Countywide
Cross Streets
Pinnacles/Sports Complex Road
Zip
93407
Total Acres
12
Parcel #
073-341-016,020,026; 052-252-001,014
State Highways
CA State Hwy 1
Railways
UPRR
Schools
Bishop Peak Elementary, Pacheco Elementary, Teach Elementary
Waterways
Brizzolara Creek, Stenner Creek
Township
30S
Range
12E
Section
22/23
Base
MDB&M

Notice of Determination

Approving Agency
Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Luis Obispo
Final Environmental Document Available at
https://afd.calpoly.edu/facilities/planning-capital-projects/ceqa/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Water Reclamation Facility Project EIR for Cal Poly University)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print