Mission Hospital Pipeline Improvements Project

2 Documents in Project

Summary

SCH Number
2022090173
Lead Agency
South Coast Water District
Document Title
Mission Hospital Pipeline Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2022
Document Description
South Coast Water District, per it’s 2017 Infrastructure Master Plan, proposes pipeline improvements for approximately 2,000 linear feet of 6-inch and 8-inch water main near the Mission Hospital that is unable to provide the required 4,000 gpm of fire flow at a 20-psi residual pressure. The Proposed Project involves replacing approximately 2,000 linear feet of 6-inch and 8-inch ACP water main with 12-inch PVC pipe, installing valves and valve clusters as required, and reconnecting service connections and fire hydrants as required. The pipeline alignment runs south along Mar Vista Avenue from 3rd Avenue to Sunset Avenue, south along Sunset Avenue to 8th Avenue, and also down a hill from Sunset Avenue to Mission Hospital. Project construction would consist of excavation, backfill, pipeline installation, and repaving. The pipelines along Mar Vista Avenue and Sunset Avenue would be installed a minimum of 40-inches below ground level and the pipeline that runs down a hill from Sunset Avenue to 5th Avenue would be installed at 24-inches below ground level. Streets affected by construction would be repaved to their pre-disturbance conditions.

Contact Information

Name
Taryn Kjolsing, P.E.
Agency Name
South Coast Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency

Location

Cities
Laguna Beach
Counties
Orange
Regions
Southern California
Cross Streets
Mar Vista Avenue, Sunset Avenue
Zip
92651
Total Acres
0.5
Parcel #
056-130-47, 056-130-65, 056-094-08, 056-094-07, 056-094-04, 056-094-05, 056-092-19, 056-094-03,
State Highways
State Route 1
Railways
none
Airports
none
Schools
John Malcolm Elementary, Moulton Elementary
Waterways
Aliso Creek, Salt Creek
Township
8S
Range
8W
Section
5
Base
SBBM

Notice of Determination

Approving Agency
South Coast Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
31592 West Street, Laguna Beach, CA 92651

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.