Mission Hospital Pipeline Improvements Project

2 Documents in Project

Summary

SCH Number
2022090173
Lead Agency
South Coast Water District
Document Title
Mission Hospital Pipeline Improvements Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Public Right-of-Way, Open Space
Document Description
The South Coast Water District, per it’s 2017 Master Plan, proposes pipeline improvements for approximately 2,000 linear feet of 6-inch and 8-inch water main near the Mission Hospital that is unable to provide the required 4,000 gallons per minute (gpm) of fire flow at a 20 pressure-per-square-inch (psi) residual pressure. The Project involves replacing 1,350 linear feet of 8-inch asbestos cement pipe (ACP) water main with 12-inch polyvinyl chloride (PVC) pipe, replacing 160 linear feet of 6-inch ACP water main with 12-inch PVC pipe, installing valves and valve clusters as required, and reconnecting service connections and fire hydrants as required. The pipeline alignment runs south along Mar Vista Avenue from 3rd Avenue to Sunset Avenue, south along Sunset Avenue to 8th Avenue, and also down a hill from Sunset Avenue to Mission Hospital. This Project is a part of the SCWD’s modified Capital Improvement Plan (CIP) to replace aging infrastructure and meet fire flow requirements to support wildfire mitigation efforts and increase fire water supply within the District’s 490 pressure zone located to the east of Pacific Coast Highway in the northern part of the District.

Contact Information

Name
Taryn Kjolsing, P.E.
Agency Name
South Coast Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency

Location

Cities
Laguna Beach
Counties
Orange
Regions
Southern California
Cross Streets
Mar Vista Avenue, Sunset Avenue
Zip
92651
Total Acres
0.5
Parcel #
056-130-47, 056-130-65, 056-094-08, 056-094-07, 056-094-04, 056-094-05, 056-092-19, 056-094-03,
State Highways
State Route 1
Railways
None
Airports
None
Schools
John Malcolm Elementary, Moulton Elementary
Waterways
Aliso Creek, Salt Creek
Township
8S
Range
8W
Section
5
Base
SBBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 12 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Office of Statewide Health Planning and Development (OSHPD), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Water Facilities (Water main replacement )(Type Pipeline, MGD 0.000001)
Local Actions
Coastal Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print