Blacklake Sewer System Consolidation Project

Summary

SCH Number
2022090039
Lead Agency
Nipomo Community Services District
Document Title
Blacklake Sewer System Consolidation Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Recreation
Document Description
The Nipomo Community Services District proposes the construction of a new 160-gallon-per-minute (gpm) lift station and associated facilities at the existing Blacklake WRF, installation of approximately 4.15 miles (21,930 linear feet) of new 6-inch force main pipeline from the proposed lift station to the existing Southland WWTF, and the decommissioning and demolition of the existing Blacklake WRF after the new lift station is completed and operating. Construction of the new lift station, installation of the pipeline, and demolition of the Blacklake WRF would occur over a 2-year anticipated work period. Project construction would generally occur in two phases, with construction and installation of the force main pipeline occurring first (Phase 1), and construction of the new lift station and decommissioning of the Blacklake WRF occurring second (Phase 2). The project would require approximately 23,600 cubic yards of cut, 25,700 cubic yards of fill, and 14,600 cubic yards of imported fill materials.

Contact Information

Name
Peter Sevcik
Agency Name
Nipomo Community Services District
Job Title
Director of Engineering and Operations
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Nipomo, Unincorporated Area
Counties
San Luis Obispo
Regions
Countywide, Unincorporated
Cross Streets
Willow Road, Sundale Way, Camino Caballo, Pomeroy Road, and Juniper Street
Zip
93444
Total Acres
N/A
Parcel #
091-411-026; 091-232-016
State Highways
U.S. Highway 101
Railways
N/A
Airports
N/A
Schools
Dana Elementary School
Waterways
Nipomo Creek, unnamed intermittent streams
Township
11N
Range
35W
Section
Multi.
Other Location Info
The proposed Blacklake Sewer System Consolidation Project would include the construction of a new lift station on the eastern side of the existing Blacklake Water Reclamation Facility (Blacklake WRF) site located on Willow Road, installation of 4.15 miles of new force main pipeline from the new lift station to the Southland Wastewater Treatment Facility, and decommissioning of the existing Blacklake WRF. The pipeline would be located within Nipomo Community Services District property and easements under County of San Luis Obispo (County) roadway right-of-way along Willow Road, Sundale Way, Camino Caballo, Pomeroy Road, and Juniper Street. Equipment and material staging would also occur on the Nipomo Community Services District-owned parcel located at the northeast corner of the intersection of Sundale Way and Camino Caballo (Assessor Parcel Number [APN] 091-232-016).

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Transportation, District 5 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Waste Treatment:Sewer (160 GPM Lift station and force main pipeline)(MGD 0.000001)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print