City of Big Bear Lake Department of Water and Power (BBLDWP): North Shore Drive Pipeline Project

Summary

SCH Number
2022080730
Public Agency
City of Big Bear Lake
Document Title
City of Big Bear Lake Department of Water and Power (BBLDWP): North Shore Drive Pipeline Project
Document Type
NOE - Notice of Exemption
Received
Posted
8/31/2022
Document Description
The purpose of the proposed project is to install a second waterline (12-inch diameter) that will provide enhanced water service to this portion of the Big Bear Lake community. This will ensure adequate water supply to the users along this alignment, including adequate fire flow.

Contact Information

Name
Reginald A. Lamson
Agency Name
City of Big Bear Lake Department of Water and Power
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Regions
Southern California
Cross Streets
within North Shore Drive and Division Drive roadways
Zip
92315

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
15282(k)
Reasons for Exemption
The State CEQA Guidelines provide a series of Statutory Exemptions for actions that have been deemed by the State Legislature not to be subject to the California Environmental Quality Act (CEQA), i.e., not a project under the CEQA Statute. The proposed action is the installation of an approximate 3,200 feet of new pipeline (12" in diameter) that would allow continued delivery of adequate water supply along the length of this new pipeline alignment. Statutory Exemption 15282 states: (k) The installation of new pipeline or maintenance, repair, restoration, removal, or demolition of the existing pipeline as set forth in Section 21080.21 of the Public Resources Code, as long as the project does not exceed one mile in length, The proposed action has been determined to fall within the scope of Statutory Exemption 15282(k). Therefore, this proposed action is not a “project” subject to CEQA or the State CEQA Guidelines.
County Clerk
San Bernardino

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print