DIX CREEK CULVERT REPLACEMENT AND REMOVAL PROJECT

4 Documents in Project

Summary

SCH Number
2022080410
Lead Agency
City of Redding
Document Title
DIX CREEK CULVERT REPLACEMENT AND REMOVAL PROJECT
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2023
Document Description
The project is limited to addressing 2017 flood damages to two culverted stream crossings on Dix Creek in Lake Redding Park (Project). Crossing 1 consists of a 60-inch, 44-foot-long corrugated metal pipe (CMP) culvert with a cobblestone headwall and wingwall. The crossing will be repaired to pre-flood conditions. To repair the crossing, 8-feet of damaged CMP will be removed, and the remaining 36-feet of undamaged culvert will be lined with new 44-foot CMP so that 8-feet of new CMP replaces the damaged culvert. The existing, damaged inlet headwall will be removed, and a new concrete inlet headwall installed. Damages to the outlet headwall will be patched and repaired, a scour hole at the outlet will be filled with rock, and bank slopes will be restored to their original contours. Crossing 2 consists of a 60-inch, 45-foot-long CMP culvert and dry-laid rock headwall at the outlet. The entirety of the crossing infrastructure will be permanently removed at this location, and 0.01 acres of open channel will be restored. Work will involve removing the transportation crossing, embankment material, rock headwall, log rails, conduit, and the 45-foot long, 60-inch CMP. Restoration involves grading the area to match existing stream contours and applying erosion control using a native seed mix. Three trees will be removed in association with Project activities.

Contact Information

Name
Helen Bowman
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Redding
Counties
Shasta
Regions
Northern California
Zip
96003
Parcel #
112-140-007-000
Waterways
Dix Creek
Other Location Info
Lake Redding Park

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
777 Cypress Avenue, Redding, CA, 96001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print