Colima Road Improvement
2 Documents in Project
Summary
SCH Number
2022080319
Lead Agency
Los Angeles County Department of Public Works
(DPW)
Document Title
Colima Road Improvement
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2022
Document Description
The project addresses traffic congestion within the Colima Road Corridor. The project will provide three vehicle traffic lanes in each direction of Colima Road from Haliburton Road to Fullerton Road; median landscaping; and a Class II Bike Lane in each direction. Roadway improvements would include resurfacing the existing roadway from the City of Whittier boundary to Hacienda Boulevard, narrowing the existing median and the existing parkway, concrete repair, catch basin reconstruction, street light relocation, traffic signal relocation/upgrades, and curb ramp upgrades.
Contact Information
Name
Alma Al Shishani
Agency Name
County of Los Angeles, Public Works
Job Title
Civil Engineer Assistant
Contact Types
Lead/Public Agency
Phone
Location
Cities
Whittier
Counties
Los Angeles
Regions
Southern California
Other Location Info
Los Angeles County, Colima Road between the eastern boundary of City of Whittier to Fullerton Road
Other Information
https://pw.lacounty.gov/uploads/tpp/Colima-Road-Project-IS-MND.pdf
Notice of Determination
Approving Agency
County of Los Angeles Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
County of Los Angeles, Public Works, Transportation Planning and Programs, 11th Floor, 900 S. Fremont Ave, Alahambra, CA 91803
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.