El Camino Real Specific Plan

Summary

SCH Number
2022080302
Lead Agency
City of Encinitas
Document Title
El Camino Real Specific Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Numerous designations within the SPA.
Document Description
The El Camino Real Specific Plan (project) seeks to develop a vibrant walkable destination for residents, to live, work, and shop through creation of sustainable job, business, and housing opportunities along the El Camino Real Corridor. The project would develop a multi-modal corridor with a mix of uses including commercial, office, public and residential uses that would allow for by right development and revitalization of the El Camino Real Corridor. Goals of the project include the following: • A reimagined vision for the revitalization of the El Camino Real corridor. • Providing critically needed housing options to infuse greater activity in the corridor and serve the community’s housing needs. • Compliance with the 2021-2029 Housing Element goals and programs. • Improved transit, bicycle, and pedestrian connections. • Enhanced green space through improvement of creek connections, street trees, and other amenities. It should be noted that while Park Encinitas, the mobile home park west of El Camino Real, is included in the SPA, this existing land use is not expected to change as part of this Specific Plan. Additionally, the Encinitas Ranch Specific Plan area is identified as a study area, as a Specific Plan Amendment to the Encinitas Ranch Specific Plan may be processed concurrent with the proposed project.

Contact Information

Name
Jennifer Gates, Planning Manager
Agency Name
City of Encinitas
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Name
Nick Larkin
Agency Name
RECON Environmental, Inc.
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm

Location

Cities
Encinitas
Counties
San Diego
Regions
Citywide
Cross Streets
El Camino Real crosses numerous streets in the Specific Plan Area
Zip
92024
Total Acres
384
Parcel #
Numerous parcels in the SPA
State Highways
I-5 and SR-1
Railways
BNSF Railway
Schools
Various
Waterways
Batiquitos Lagoon
Township
13S
Range
4W
Section
2,11,4

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Water Resources (DWR), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, District 14, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC), California Department of Transportation, District 11 (DOT), California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 11 (DOT), California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Other (No development proposed yet. In progress.)
Local Actions
Specific Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print