Blue Wave Car Wash
2 Documents in Project
Summary
SCH Number
2022080293
Lead Agency
City of Pittsburg
Document Title
Blue Wave Car Wash
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2023
Document Description
BlueWave Express Car Wash and CEI Engineering (Applicant) proposes to develop a BlueWave Express Car Wash and self-service vacuum facility (proposed project) on an approximately 1.36-acre site. The proposed project would provide a total of 26 parking spaces and would include a 100-foot drive-through vehicle wash tunnel; three 12.5-foot drive-through pay lanes; three drive-through payment stations; 22 vacuum stalls (2 American Disabilities Act (ADA) accessible); and paved driveways. Paved surfaces would total 43,971 square feet. There would be a 10-foot setback along the north and south ends of the project site. The drive-thru vehicle wash tunnel would be located on the northern end of the site. The vehicle wash tunnel would have a floor area of 3,600 square-feet. The building height would be 18-feet 4-inches but would include a 31-foot tower at the west side and a 25-foot 4-inch tower at the east side. The building exterior would consist of white aluminum panels, gray stucco accents, a black metal roof, and a blue cloth canopy.
Contact Information
Name
Kelsey Gunter
Agency Name
City of Pittsburg
Job Title
Associate Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Antioch, Brentwood, Clayton, Concord, Martinez, Oakley, Pittsburg
Counties
Contra Costa
Regions
Citywide, Countywide
Cross Streets
Loveridge Road
Zip
94565
Jobs
4
State Highways
State Route 4
Notice of Determination
Approving Agency
City of Pittsburg
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
https://www.pittsburgca.gov/services/community-development/planning/public-reviews
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.