Interstate 880 Innovation Bridge and Trail Project
2 Documents in Project
Summary
SCH Number
2022080253
Lead Agency
City of Fremont
Document Title
Interstate 880 Innovation Bridge and Trail Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2023
Document Description
The Project consists of the following elements: 1) At-grade Class I multi-use trail for approximately 3,300 feet along the west side of Kato Road south of the intersection of Industrial Drive to the eastern approach ramp for the I-880 overcrossing bridge and approximately 540 feet between the western approach ramp and Fremont Boulevard. 2) I-880 overcrossing bridge would be approximately 850 feet in length with approach ramps totaling approximately 625 feet (310 feet for the eastern approach ramp and 315 for the western approach ramp). The bridge concept features an architecturally prominent single-tower cable-stayed structure with a 200-foot-tall pylon that accentuate the drastic curvature of the main span immediately west of Landing Parkway. The area next to the pylon would include a pathway and staircase, low shrubbery, lighting, irrigation, and signage. 3) A raised cycle track would be installed along the eastern side of Fremont Boulevard connecting to the Fremont Boulevard/Industrial Drive intersection from the south.
Contact Information
Name
Wayland Li
Agency Name
City of Fremont
Job Title
Principal Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Fremont
Counties
Alameda
Regions
San Francisco Bay Area
Cross Streets
Approximately 0.4 miles north of the I-880/Mission Boulevard/W. Warren Avenue interchange
Zip
94538
State Highways
I880, I680, SR262
Railways
BART, Union Pacific RR
Schools
Lila B ES, Warm Springs ES, James L ES
Waterways
Agua Caliente Creek
Notice of Determination
Approving Agency
City of Fremont
Approving Agency Role
Lead Agency
Approved On
County Clerk
Alameda
Final Environmental Document Available at
https://www.fremont.gov/government/departments/community-development/planning-building-permit-services/environmental-review
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Responses to Comments
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.