Robust Airport Charging for Electric Ride Hail Fleets "RACER" Project

Summary

SCH Number
2022070366
Public Agency
California Energy Commission
Document Title
Robust Airport Charging for Electric Ride Hail Fleets "RACER" Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/20/2022
Document Description
Install and provide DCFC equipment capable of supporting 48 EV simultaneously at one charging site, an already paved parking lot near Los Angeles International Airport, for ride-hailing and taxi drivers.

Contact Information

Name
Anita Carraher
Agency Name
California Energy Commission
Job Title
Energy Analyst
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Cross Streets
5455 W 111th St, Los Angeles, CA 90045
Zip
90045

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Cal. Code Regs., tit. 14, sec. 15301, 15303, 15304
Reasons for Exemption
This project involves the installation of approximately 48 electric vehicle chargers, and supporting hardware, housed within approximately 6 shipping containers, at an existing paved parking lot. The containers will be installed on the parking lot, connected to existing electrical panels also located within the existing lot, and will involve negligible or no expansion of use. Therefore, the project falls within section 15301 and will not have a significant effect on the environment. This project consists of installation of approximately 6, 20' shipping containers pre-fabricated with electric vehicle charging equipment installed inside each container. There will be a total of approximately 48 charging stations inside all of the containers. The overall dimensions are approximately 278' x 66'. Therefore, the project falls within section 15303 and will not have a significant effect on the environment. In this project, minor trenching may be necessary to lay two-inch conduit from the existing electrical panel to the charging equipment, totaling approximately 2 cubic feet per foot of distance from the electrical panel, to connect the proposed new electric vehicle charging station equipment to an existing electrical supply panel. The trenching will take place on currently paved ground, will not involve the removal of any trees, and surface will be restored. Therefore, the project falls within section 15304 and will not have a significant effect on the environment.

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.