City of Chino State Street Water Treatment Project (WA212)

2 Documents in Project

Summary

SCH Number
2022070197
Lead Agency
City of Chino
Document Title
City of Chino State Street Water Treatment Project (WA212)
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2022
Document Description
The proposed project consists of development of a State Street Water Treatment Facility (State Street WTF), which will be a new centralized treatment project that will treat water from Wells 12 and 14 for nitrate, perchlorate, and 1,2,3-TCP. The project also includes installation of offsite water transmission and brine pipelines, improvements to the existing wells, and site improvements. The water treatment facility will have a capacity to treat up to 4,000 gallons per minute (gpm) and the anticipated extraction rate from each well is 2,000 gpm. The proposed project would provide treatment for nitrate, perchlorate, and 1,2,3 TCP at Wells 12 and 14. Treatment is anticipated to include pretreatment through sand separators followed by cartridge filters (solids removal), 1,2,3-TCP Removal through Granular Activated Carbon (GAC), perchlorate and nitrate removal through a proprietary ion exchange (IX) treatment system, then disinfection and storage in Reservoir 5 before distribution. The IX treatment system generates wastewater known as brine, that will be disposed of through a new connection to north Non-Reclaimable Wastewater System (NRWS) brine disposal pipeline that is managed locally by the Inland Empire Utilities Agency (IEUA). The GAC system generates a periodic backwash water when the media is replaced that will be disposed of accordingly.

Contact Information

Name
Maria Fraser
Agency Name
City of Chino
Job Title
CIP Engineering Manager
Contact Types
Lead/Public Agency

Location

Cities
Chino
Counties
San Bernardino
Regions
Citywide
Cross Streets
West State Street and South Benson Avenue
Zip
91710
Total Acres
~4.51
Parcel #
101124118 and 101404210
State Highways
I-10 & SR-60
Railways
N/A
Airports
Ontario Int'l Airport
Schools
Oaks MS / Mission ES
Waterways
N/A
Township
1S
Range
8W
Section
26
Base
SBBM

Notice of Determination

Approving Agency
City of Chino
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
Chino City Hall, 13220 Central Avenue, Chino, CA 91710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print