City Center Project

3 Documents in Project

Summary

SCH Number
2022070186
Lead Agency
City of Redlands
Document Title
City Center Project
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2022
Document Description
The Project proposes to construct a new mixed-use development consisting of multi-family residential units and restaurant uses. The Project would construct 131 multifamily dwelling units and 23,476 square feet (SF) of amenity space consisting of a 9,770 SF roof deck, a 7,380 SF pool plaza, a 5,356 SF spa plaza, and a 527 SF upper lounge. The Project also proposes 10,550 SF of restaurant space on the corner of Eureka Street and Brookside Avenue. The proposed apartment building would be 4-stories with a maximum height of 55 feet from grade. The proposed restaurant buildings would be 30 feet in height. The Project would be accessed via four proposed driveways: two along Brookside Avenue, one along Eureka Street, and one along West Citrus Avenue. The Project would develop a ground floor and subterranean parking garage located beneath the proposed residential building. The Project also proposes a single-level parking structure beneath the apartment building with approximately 100 covered parking spaces to serve future residents. Access to this parking structure would be provided the internal access lane to the north of the proposed residential building. In addition to the proposed parking structure, the Project also proposes a surface lot for with 110 spaces for restaurant employees, restaurant patrons, and guests. The Project would install a variety of ornamental shrubs and groundcovers for a total of 18,223 SF of landscape area. The proposed Project would dedicate 4 feet of right-of-way to Eureka Street. The Project would construct new 8-foot-wide sidewalks along Eureka Street, Citrus Avenue, and Brookside Avenue. New curb and gutter are proposed along the northeast property line. A new curb is also proposed along a portion of the northwest property line. The Project would install new onsite potable water infrastructure that would connect to existing 12-inch domestic water lines in Brookside Avenue and Eureka Street. Additionally, the Project would install fire water lines onsite that would connect to the existing and proposed 12-inch domestic water lines in Brookside Avenue and Eureka Street. The Project would install two new 14-inch onsite sewer lines that would connect to the existing 14-inch sewer line in First Street and a new 14-inch sewer line in Eureka Street that would connect to the existing 8-inch sewer line in North Eureka Street. The Project also proposes to realign existing public and private sewer lines within the site. The Project would install new storm drain lines throughout the site and realign existing storm drain lines. Two corrugated metal pipe (CMP) underground storage systems are proposed: one in the northeastern portion of the Project site and the other in the northwestern portion of the Project site.

Contact Information

Name
Sean Reilly
Agency Name
City of Redlands
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Redlands
Counties
San Bernardino
Regions
Citywide
Cross Streets
Brookside Avenue, Eureka Street, W. Citrus Avenue
Zip
92373
Total Acres
3.03
Jobs
85
Parcel #
017-110-101 through -105; 017-121-111 through -121
State Highways
I-10
Railways
SBCTA Arrow Line
Schools
RUSD; University of Redlands
Waterways
Santa Ana River
Township
1S
Range
3W
Section
27
Base
SanBern

Notice of Determination

Approving Agency
City of Redlands
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Redlands Planning Division, 35 Cajon Street, Suite 20, Redlands, CA 92373

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Sustainable Communities Environmental Assessment)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print