Fountaingrove Apartments

Summary

SCH Number
2022060733
Public Agency
City of Santa Rosa
Document Title
Fountaingrove Apartments
Document Type
NOE - Notice of Exemption
Received
Posted
6/30/2022
Document Description
The project consists of the construction and operation of 239 multi-family residential apartment units on three contiguous parcels comprising approximately 9.6 acres. The residential apartments will be contained within six (6) detached structures ranging from three to five stories in height.

Contact Information

Name
Monet Sheikhali
Agency Name
City of Santa Rosa
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Justin Hayman
Agency Name
A+L Real Estate Holding Company LLC
Job Title
Applicant
Contact Types
Project Applicant

Location

Cities
Santa Rosa
Counties
Sonoma
Regions
Citywide
Cross Streets
Fountaingrove Parkway/Mendocino Ave; Fountaingrove Parkway/Round Barn Blvd
Zip
95403
Total Acres
9.6
Parcel #
173-020-051; -052; -053
State Highways
US 101
Railways
N/A
Airports
N/A
Schools
Steele Lane Elementary School, Santa Rosa High School
Waterways
Russel Creek

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
CEQA Guidelines Section 15183
Reasons for Exemption
The Environmental Checklist for Streamlined Review prepared for the project and dated June 2022 demonstrates that construction and operation of the project is within the scope of the Santa Rosa General Plan EIR, which was certified by the City of Santa Rosa in November 2009. In summary, no new significant impacts or more severe significant impacts would result from implementation of the project that were not previously identified and mitigated in the General Plan EIR, and no substantive new mitigation measures would be required for implementation of the project. As discussed specifically in the checklist for streamlined review, there are no impacts that are peculiar to the project site and there have been no substantial changes in environmental circumstances that would result in new or more severe significant environmental effects than were identified and evaluated in the General Plan 2035 EIR. The project is required to implement all applicable mitigation measures identified in the EIR as well as policies and implementation measures contained in the City’s adopted General Plan. Mitigation measures identified in the General Plan EIR that are applicable to the project were adopted as conditions of approval at a public hearing of the Santa Rosa Zoning Administrator on June 13, 2022.
County Clerk
Sonoma

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print