Permit No. 19718 – Feather River Fish Monitoring Station

5 Documents in Project

Summary

SCH Number
2022060721
Lead Agency
California Department of Water Resources (DWR)
Document Title
Permit No. 19718 – Feather River Fish Monitoring Station
Document Type
NOD - Notice of Determination
Received
Posted
5/1/2023
Document Description
Approval of Permit No. 19718, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install approximately 56 20-foot long by three-foot wide Alaskan-style resistance board weir panels with 17 10-foot wide substrate rails anchored to the streambed, fish trap, Passive Integrated Transponder antenna array, camera system, and warning signs. All systems will be powered by a fenced solar panel array and appurtenances that will be installed onsite.

Contact Information

Name
Jamie Silva
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Oroville
Counties
Butte
Regions
Northern California
Other Location Info
The project is in and adjacent to the low-flow channel (LFC) of the Feather River, approximately 1.6 miles upstream of the Thermalito Afterbay Outlet, southwest of the town of Oroville, in Butte County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the approval of this encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print